1962-1973 Cessna 172 Series Parts Catalog Manual – PDF DOWNLOAD
IMAGES PREVIEW OF THE MANUAL:
DESCRIPTION:
1962-1973 Cessna 172 Series Parts Catalog Manual – PDF DOWNLOAD
INTRODUCTION.
This illustrated parts catalog has been prepared to aid
you in easily and quickly identifying parts of the models
covered herein.
This catalog features an index system consisting of:
l. An alphabetical index located in the front of the
catalog.
2. A numerical index located in the back of the
catalog, which Usts all parts and figures in
which they appear.
STANDARD PARTS.
Many parts having standard usage have been incorporated
into the Cessna Standard System. Parts in this
group are designated with the part number prefix “S”.
For standard hardware items such as Tinnerman nuts,
clamps, etc., “AN” and “NAS” numbers have been
used.
USABLE ON CODES ..•• Serial Ustings in this catalog
are noted by a letter code located in the usable on code
column which is the extreme right hand column of the
parts Ust page. Usable on codes are appUcable only
to the figure on which they appear. The code letters
and the seríais to which they apply are Usted at the
end of the figure.
If no usable on code appears opposite a first column
Usting of the figure, the usage is applicable to all
models and serials covered by this catalog. If no
usable on code appears opposite any indented listing,
the usage is appUcable to all models and serials covered
by the figure on which it appears.
TABLE OF CONTENTS:
1962-1973 Cessna 172 Series Parts Catalog Manual – PDF DOWNLOAD
Cover…………………………………………………………………. 1
List of Effective Pages…………………………………………………. 2
Revision 1-28-1976……………………………………………………… 3
Revision 2-17-1978……………………………………………………… 4
Introduction…………………………………………………………… 5
Finish & Trim Plate…………………………………………………….. 7
Code Chart – Paint & Upholstery Combinations………………………………. 8
Upholstery & Interior Trim………………………………………………. 21
Alphabetical Index……………………………………………………… 39
A…………………………………………………………………. 40
B…………………………………………………………………. 41
C…………………………………………………………………. 42
D…………………………………………………………………. 44
E – F……………………………………………………………… 45
G – H……………………………………………………………… 48
I…………………………………………………………………. 49
J – L……………………………………………………………… 50
M…………………………………………………………………. 51
N…………………………………………………………………. 52
O – P……………………………………………………………… 53
R…………………………………………………………………. 54
S…………………………………………………………………. 55
T…………………………………………………………………. 58
U…………………………………………………………………. 59
V – W……………………………………………………………… 60
Y…………………………………………………………………. 61
Parts Listing & Figures…………………………………………………. 63
Fig 1. Miscellaneous Bulk Items………………………………………. 66
Fig 2. (Sheet 1 of 5) Placards, Nameplates & Exterior Markings…………… 68
Fig 2. (Sheet 2 of 5) Placards, Nameplates and Exterior Markings…………. 69
Fig 2. (Sheet 3 of 5) Placards, Nameplates and Exterior Markings…………. 70
Fig 2. (Sheet 4 of 5) Placards, Nameplates & Exterior Markings…………… 72
Fig 2. (Sheet 5 of 5) Placards, Nameplates & Exterior Markings…………… 74
Fig 3. (Sheet 1 of 4) Placards, Nameplates & Exterior Markings…………… 80
Fig 3. (Sheet 2 of 4) Placards, Nameplates & Exterior Markings…………… 81
Fig 3. (Sheet 3 of 4) Placards, Nameplates & Exterior Markings…………… 82
Fig 3. (Sheet 4 of 4) Placards, Nameplates & Exterior Markings…………… 83
Fig 4. Wing Assembly Complete………………………………………… 84
Fig 5. Fuel Tank Well Cover Assemblies Installation…………………….. 88
Fig 6. Wing Structure Assembly……………………………………….. 90
Fig 7. Wing Structure Assembly……………………………………….. 94
Fig 8. Wing Structure Assembly – Long Range……………………………. 96
Fig 9. Wing Structure Assembly – Long Range…………………………….100
Fig 10. Wing Leading Edge Assembly…………………………………….104
Fig 11. Wing Leading Edge Assembly…………………………………….106
Fig 12. Wing Spars Assemblies…………………………………………108
Fig 13. Wing Spars Assemblies…………………………………………112
Fig 14. Skins and Stringers Installation……………………………….114
Fig 15. Skins and Stringers Installation……………………………….116
Fig 16. Fuel Tank Installation………………………………………..118
Fig 17. Fuel Tank Installation………………………………………..122
Fig 18. Fuel Tank Drain Valve Installation……………………………..125
Fig 19. Aileron Installation………………………………………….126
Fig 20. Flap Installation…………………………………………….128
Fig 21. Strut Assembly – Wing…………………………………………130
Fig 22. Fin Installation……………………………………………..132
Fig 23. Rudder Assembly………………………………………………134
Fig 24. Stabilizer Installation……………………………………….138
Fig 25. Elevator Trim Tab Actuator Assembly…………………………….140
Fig 26. Elevator Installation…………………………………………142
Fig 27. Fuselage Assembly…………………………………………….144
Fig 28. Fuselage Front & Center Section Assembly………………………..146
Fig 29. Fuselage Front & Center Section Assembly………………………..150
Fig 30. Fuselage Front & Center Section Assembly………………………..152
Fig 31. Fuselage Front Section Structure Assembly……………………….156
Fig 32. Fuselage Front Section Structure Assembly……………………….160
Fig 33. Fuselage Front Section Structure Assembly……………………….162
Fig 34. Front Doorpost Bulkhead Assembly……………………………….166
Fig 35. Front Doorpost Bulkhead Assembly……………………………….168
Fig 36. Fuselage Tunnel Assembly………………………………………171
Fig 37. Front Section Tunnel Components………………………………..172
Fig 38. Console Structure Assembly…………………………………….173
Fig 39. Firewall Assembly…………………………………………….174
Fig 40. Firewall Assembly…………………………………………….176
Fig 41. Firewall Assembly…………………………………………….178
Fig 42. Firewall Assembly…………………………………………….180
Fig 43. Firewall Grommets Installation…………………………………181
Fig 44. Fuselage Bulkhead Assembly Sta. 65. 33………………………….182
Fig 45. Rear Doorpost Bulkhead Assembly………………………………..184
Fig 46. Landing Gear Bulkhead Assembly Sta. 44.00 To 65.33……………….186
Fig 47. Landing Gear Bulkhead Assembly Sta. 44.00 To 65.33……………….188
Fig 48. Windshield Installation……………………………………….190
Fig 49. Fuselage Aft Section Assembly………………………………….192
Fig 50. Dorsal Fin Assembly…………………………………………..197
Fig 51. Extended Baggage Installation………………………………….198
Fig 52. Fuselage Tailcone Assembly Sta. 205.812 To 228.812……………….200
Fig 53. Battery Box Installation………………………………………202
Fig 54. Battery Box Installation………………………………………205
Fig 55. Nose Gear Installation………………………………………..206
Fig 56. Heavy Duty Nose Gear Installation………………………………210
Fig 57. Nose Gear Shock Strut Assembly…………………………………212
Fig 58. Heavy Duty Nose Gear Shock Strut Assembly……………………….216
Fig 59. Goodyear Nose Gear Wheel Assembly………………………………218
Fig 60. Cleveland Nose Gear Wheel Assembly……………………………..219
Fig 61. Nose Gear Wheel Assembly (Alternate)……………………………220
Fig 62. Nose Gear Wheel Assembly – Heavy Duty…………………………..222
Fig 63. Nose Gear Wheel Assembly – Heavy Duty…………………………..223
Fig 64. Shimmy Dampener Assembly………………………………………224
Fig 65. Shimmy Dampener Assembly………………………………………225
Fig 66. Shimmy Dampener Assembly – Heavy Duty…………………………..226
Fig 67. Main Landing Gear Installation…………………………………228
Fig 68. Main Landing Gear Installation…………………………………232
Fig 69. Main Landing Gear Wheel & Brake Assembly………………………..236
Fig 70. Main Landing Gear Wheel & Brake Assembly………………………..238
Fig 71. Main Gear Wheel & Brake Assembly (Alternate)…………………….242
Fig 72. Left Cabin Door Assembly………………………………………244
Fig 73. Left Cabin Door Assembly………………………………………248
Fig 74. Right Cabin Door Assembly……………………………………..252
Fig 75. Right Cabin Door Assembly……………………………………..256
Fig 76. Right Cabin Door Assembly – Openable Window……………………..258
Fig 77. Cabin Door Latch Assembly……………………………………..262
Fig 78. Cabin Door Latch Assembly……………………………………..264
Fig 79. Cabin Door Thumb Latch Assembly………………………………..267
Fig 80. Baggage Door Installation……………………………………..268
Fig 81. Baggage Door Installation……………………………………..270
Fig 82. Cabin Top & Firewall Upholstery Installation…………………….272
Fig 83. Upholstery Installation – Cabin Top & Firewall…………………..276
Fig 84. Cabin Side Panels & Floorboard Upholstery Installation……………280
Fig 85. Cabin Side Panels & Floorboard Upholstery Installation……………286
Fig 86. Soundproofing Installation…………………………………….288
Fig 87. Pilot & Co-Pilot Seat Installation……………………………..290
Fig 88. Pilot & Co-Pilot Seat Installation……………………………..292
Fig 89. Pilot & Co-Pilot Seat Installation……………………………..296
Fig 90. Vertically Adjustable Front Seat Installation……………………300
Fig 91. Pilot & Co-Pilot Power Adjustable Seat Installation………………304
Fig 92. Power Seat Bottom Assembly – Pilot & Co-Pilot……………………308
Fig 93. Infinitely Adjustable Front Seat Installation……………………310
Fig 94. Infinitely Adjustable Front Seat Installation……………………314
Fig 95. Rear Seat Installation – Individually Reclining Back……………..318
Fig 96. Rear Seat Installation – One Piece Reclining Back………………..322
Fig 97. Auxiliary Seat Installation……………………………………326
Fig 98. Auxiliary Seat Installation……………………………………328
Fig 99. Stationary Instrument Panel Equipment Installation……………….330
Fig 100. Stationary Instrument Panel Equipment Installation………………334
Fig 101. Shock Mounted Instrument Panel Assembly………………………..336
Fig 102. Instrument Panel Equipment Installation………………………..342
Fig 103. Instrument Panel Equipment Installation………………………..346
Fig 104. Instrument Panel Equipment Installation………………………..350
Fig 105. Instrument Panel Equipment Installation………………………..356
Fig 106. Instrument Panel Equipment Installation………………………..362
Fig 107. Map Compartment Installation………………………………….368
Fig 108. Fuselage Equipment Installation……………………………….370
Fig 109. Portable Stretcher Installation……………………………….376
Fig 110. Step & Handle Installation……………………………………377
Fig 111. Propeller Installation……………………………………….379
Fig 112. Propeller Installation……………………………………….380
Fig 113. Propeller Installation……………………………………….381
Fig 114. Constant Speed Propeller Installation………………………….383
Fig 115. Engine Cowl Assembly…………………………………………384
Fig 116. Engine Cowl Assembly…………………………………………386
Fig 117. Engine Cowl Assembly…………………………………………388
Fig 118. Engine Cowl Assembly…………………………………………390
Fig 119. Engine Cowl Assembly…………………………………………394
Fig 120. Engine Cowl Assembly – Dual Landing Light………………………396
Fig 121. Engine Cowl Assembly…………………………………………398
Fig 122. Engine Installation………………………………………….400
Fig 123. Engine Installation (Sheet 1 of 2)…………………………….404
Fig 123. Engine Installation (Sheet 2 of 2)…………………………….405
Fig 124. Engine Installation………………………………………….410
Fig 125. Engine Assembly……………………………………………..414
Fig 126. Engine Assembly……………………………………………..418
Fig 129. Propeller Governor Assembly…………………………………..422
Fig 130. Propeller Governor Assembly…………………………………..424
Fig 131. Exhaust Stack Assembly……………………………………….426
Fig 132. Exhaust System Assembly………………………………………428
Fig 133. Engine Baffles Installation…………………………………..430
Fig 134. Engine Baffles Installation…………………………………..434
Fig 135. Engine Baffles Installation…………………………………..436
Fig 136. Engine Baffles Installation…………………………………..440
Fig 137. Winterization Equipment………………………………………442
Fig 138. Cabin Ventilation System Installation………………………….444
Fig 139. Cabin Ventilation System Installation………………………….446
Fig 140. Cabin Heating & Defrosting System Installation………………….450
Fig 141. Cabin Heating & Defrosting System Installation………………….452
Fig 142. Brake System Installation…………………………………….454
Fig 143. Brake System Installation…………………………………….458
Fig 144. Brake System………………………………………………..462
Fig 145. Brake & Rudder Pedals Installation…………………………….466
Fig 146. Master Brake Cylinder Assembly………………………………..468
Fig 147. Control Tee Installation……………………………………..470
Fig 148. Control Yoke Installation…………………………………….472
Fig 149. Aileron Control System Installation……………………………476
Fig 150. Aileron Control System Installation……………………………480
Fig 151. Wing Leveler Installation…………………………………….482
Fig 152. Wing Leveler Components Installation…………………………..484
Fig 153. Wing Leveler Components Installation…………………………..488
Fig 154. Elevator Control System Installation…………………………..490
Fig 155. Elevator Control System Installation…………………………..492
Fig 156. Elevator Trim Control System Installation………………………494
Fig 157. Elevator Trim Control System Installation………………………496
Fig 158. Flap Control System Installation………………………………498
Fig 159. Flap System Installation – Electric……………………………502
Fig 160. Rudder Control System Installation…………………………….504
Fig 161. Pitot System Installation…………………………………….506
Fig 162. Stall Warning Horn Installation……………………………….511
Fig 163. Oil Filter Installation………………………………………512
Fig 164. Oil Filter Installation………………………………………514
Fig 165. Fuel System Installation……………………………………..516
Fig 166. Fuel System Installation……………………………………..520
Fig 167. Fuel System Installation……………………………………..524
Fig 168. Fuel System Installation……………………………………..528
Fig 169. Fuel Strainer & Drain Control Installation……………………..532
Fig 170. Fuel Strainer & Drain Control Installation……………………..534
Fig 171. Fuel Selector Valve Assembly………………………………….536
Fig 172. Auxiliary Fuel Tank Installation………………………………538
Fig 173. Three Cylinder Fuel Primer Installation………………………..541
Fig 174. Six Cylinder Priming System Installation……………………….542
Fig 175. Directional & Horizontal Gyro Usage……………………………543
Fig 176. Venturi & Gyro System Installation…………………………….544
Fig 177. Venturi & Gyros System Installation……………………………546
Fig 178. Venturi & Gyros System Installation……………………………548
Fig 179. Venturi & Gyro System Installation…………………………….550
Fig 180. Engine Driven Vacuum System Installation……………………….552
Fig 181. Engine Driven Vacuum System Installation……………………….556
Fig 182. Engine Driven Vacuum System Installation……………………….558
Fig 183. Engine Driven Vacuum System Installation……………………….560
Fig 184. Vacuum System Installation……………………………………564
Fig 185. Vacuum System Installation……………………………………568
Fig 186. Manifold Pressure Gage and Carburetor Air Temp Gage Installation….570
Fig 187. Floatplane Fittings Installation………………………………572
Fig 188. Rudder-Aileron Interconnect-Floatplane…………………………575
Fig 189. Floatplane Fuselage Structure Details………………………….576
Fig 190. Electrical Equipment Installation……………………………..578
Fig 191. Electrical Equipment Installation……………………………..582
Fig 192. Fuselage Electrical Equipment Installation……………………..586
Fig 193. Instrument Panel Lights Installation…………………………..588
Fig 194. Instrument Panel Lights Installation…………………………..590
Fig 195. Instrument Panel Lights Installation…………………………..592
Fig 196. Landing Light Installation……………………………………594
Fig 197. Landing Light Installation……………………………………595
Fig 198. Dual Landing Lights………………………………………….596
Fig 199. Courtesy Light Installation…………………………………..597
Fig 200. Rotating Beacon Installation………………………………….598
Fig 201. Flashing Beacon Light Installation…………………………….600
Fig 202. Map Light Installation……………………………………….602
Fig 203. Alternator Installation………………………………………604
Fig 204. Control Wheel Map Light Installation…………………………..606
Fig 205. Ground Service Plug Installation………………………………608
Numerical Index…………………………………………………………609
PLEASE NOTE:
- This is the SAME manual used by the dealers to troubleshoot any faults in your vehicle. This can be yours in 2 minutes after the payment is made.
- Contact us at [email protected] should you have any queries before your purchase or that you need any other service / repair / parts operators manual.
S.V